Wokingham-hero-image

The Fleur de Lis retirement complex in Wokingham was developed by Renaissance Retirement. They used advanced construction methods to ensure that the U values of the building fabric were low.

This made the property ideal for a ground source heat pump and The Renewable Design Company were happy to carry out the design and installation.

  • System size: 165kW split across two Dimplex ground source heat pumps
  • Heat source: 20 boreholes under the building
  • Provides full heating and hot water provision for the development
  • Funded by Rendesco
Wokingham-building

Talk to us today

If you have questions about heat pumps or a specific project then we would love to hear from you!

Footer